totaltenders
Buying Organisation
Mid Yorkshire Teaching NHS Trust
Contract Value
Unknown
Suitable for SMEs
Yes
Suitable for VCSEs
Yes
This project entails the complete transition of all heating systems at Ashton Centre, Cullingworth House and Woodkirk from fossil fuel to electric, through the use of air source heat pumps (ASHP). This project also includes the installation of solar panels to aid in the additional electrical requirements of the heat pump solution.
The project has received government funding for design and construction of the low carbon system through the PSDS funding stream.
Within the tender pack will be a document to provide a description of the heat pump in sufficient detail to enable the appointed contractor to novate acceptance of the detailed design scope of works, select necessary changes to the existing installations to successfully integrate heat pumps into the existing infrastructure. It also provides high level guidance to the contractor on commissioning and testing.
None of the documentation within the tender pack will release the contractor from the responsibility of installing the system in line with relevant British Standards and regulations, and to deliver a fully functional and efficiency system.
The specification should be read in conjunction with the full document suite within the tender pack.
Heating works (CPV 45232141)
Electricity, heating, solar and nuclear energy (CPV 09300000)
Heating engineering services for buildings (CPV 71314310)
Yorkshire and the Humber (UKE)
Mid Yorkshire Teaching NHS Trust
Further information on this tender from Mid Yorkshire Teaching NHS Trust when you create a FREE Account
View all of your tenders, see forthcoming opportunities, access data/reports.