he works involve the replacement of the existing Carrier 30RB water chiller and existing carbon steel pipework at the Max Perutz Building, located on the Byrom Street Campus, at Liverpool John Moores University.
The enabling package includes the replacement of the existing Carrier chiller and all associated vessels, tanks, valves and pipework and all existing press fit (crimped) carbon steel CT, chilled water and run around coil pipework supplying the ahu's and coils to the rear elevation plant deck area of the Max Perutz Building, with a combination of malleable iron pipework and 316 stainless steel pipework system complete with new thermal insulation.
Connecting to the existing malleable iron pipework supplies from the building as they enter the outside plant area, utilising as many of the existing valves and controls as practicable.
The pipework sizes should remain the same size as the existing pipework, flow rates are to be taken before and after the works and then balanced on completion of the works. Water samples should be taken from the system before and after the works to ascertain the levels of corrosion, ph. and manufactures recommended dosage strength.
2nr non-working days will need to be allowed for in the contractor's programme due to university open days.
Mechanical engineering installation works (CPV 45351000)
Cooling and ventilation equipment (CPV 42500000)
Mechanical engineering services (CPV 71333000)
Ventilation equipment (CPV 42520000)
Electrical engineering installation works (CPV 45315100)
Mechanical and electrical engineering services (CPV 71334000)
HVAC packages (CPV 42512300)
United Kingdom (UK)
Liverpool John Moores University
Further information on this tender from Liverpool John Moores University when you create a FREE Account
View all of your tenders, see forthcoming opportunities, access data/reports.