totaltenders
Buying Organisation
AMEY OW LIMITED
Contract Value
£1,500,000
Suitable for SMEs
Yes
Suitable for VCSEs
Yes
With continuing deterioration and repairs of the existing surfacing, a task order was issued in 2023 for a detail design of the resurfacing of the Prince of Wales (M4) Cable Stay section of the bridge by National Highways.
This is intended as the first phase of the works, with the resurfacing of the Gwent and Avon Viaduct likely to follow suit. The works to include the removal of the existing surfacing, binder course and waterproofing layer of all three lanes up to the edge of the drainage systems within the hard shoulder. This should allow for the proposed waterproofing layer to be 'lapped' in the hard shoulder before reinstatement of the new binder and surfacing layer. Full resurfacing of Cable Stay Bridge including traffic management, any concrete repairs and waterproofing. Works are further detailed within the attached scope and specification documents.
AMEY is seeking bids from qualified Suppliers for the delivery of Traffic Management activities on the SBIM project (Severn Bridge)
Bids should be in accordance with the details, terms and conditions, documents detailed herein.
Control, safety or signalling equipment for roads (CPV 34996000)
South West (UKK)
AMEY OW LIMITED
Further information on this tender from AMEY OW LIMITED when you create a FREE Account
View all of your tenders, see forthcoming opportunities, access data/reports.